These reports are based on ‘received information’ from either the county council, local councils (through planning process), developers, local businesses, etc. This information would come to us after many discussions that culminate in highway design drawings and detailed route/corridor information being received.

The response to these delivered drawings & information is to again assess them against the criteria within Cycle Infrastructure Design standards LTN 1/20 and to offer up our cycling experience views.

These are shorter reports and contain an introduction, but will mainly concentrate of the design interventions noted from our audit survey’s and the actions and/or recommendations required to bring those interventions in align with LTN 1/20 or more importantly to ensure that all cycling & walking infrastructure in town is safe for ‘ALL’ users.